Foreword
1 Scope
2 Normative References
3 Terms and Definitions
4 General
5 Materials
5.1 Bitumen
5.2 Aggregate
5.3 Filler
5.4 Modifier
6 Determination of Mix Proportion
7 Preparation and Transportation of Bituminous Mixture
7.1 Batching Plant (Station)
7.2 Heating of Raw Material
7.3 Batching
7.4 Mixing
7.5 Transportation
8 Placement of Bituminous Concrete Facing
8.1 General Provisions
8.2 Construction of Bedding Layer
8.3 Paving of Bituminous Mixture
8.4 Compaction of Bituminous Mixture
8.5 Construction Joint and Treatment between Layers
8.6 Connection between Facing and Rigid Structures
8.7 Construction of Confining Layer
9 Paving of Bituminous Concrete Core
9.1 Preparation before Construction
9.2 Formwork
9.3 Paving of Intermediate Material
9.4 Spreading of Bituminous Mixture
9.5 Compaction of Bituminous Mixture
9.6 Construction Joint and Surface Treatment
10 Bituminous Concrete Construction in Low Temperature and Rainy Season
10.1 Low Temperature Construction and Winter Protection
10.2 Construction in Rainy Season and Flood Protection
11 Safety Monitoring
11.1 General
11.2 Installation and Observation
12 Construction Quality Control
12.1 Inspection and Control of Raw Materials
12.2 Quality Inspection and Control for Preparing Bituminous Mixture
12.3 Quality Inspection and Control of Bituminous Concrete Construction